In Place Cost

Bulten’s advanced products are intended to reduce total costs (so-called In-Place-Cost, IPC) for the customer. IPC is the total cost from development until the fastener is mounted and performs its function.

Bulten - In Place Cost 
  •   Fastener cost

  •   Product development
  •   Procurement
  •   Inspection/quality
  •   Warehousing
  •   Internal logistics
  •   Pre assembly
  •   Assembly

 

The cost of the physical fastener normally amounts to about 15% of the total cost. By using Bulten’s innovative solutions and value-added technologies the customer can achieve cost reductions of IPC while maintaining – and in many cases improve – performance. This is done, for example by standardization, simplified assembly and reduction of indirect peripheral costs such as development costs.


Example: IN PLACE COST INDEX

 
TAPTITE® vs Metric bolts in Aluminium members

In place cost - Taptite vs Metric bolts in Aluminium members